GDS BPM drawing TRCA of ₹4830 from 1.7.2017 in the TRCA slab of 4575-85-7125 with annual increase of ₹85 on July
Category of GDS |
Pre revised TRCA as on 1.7.2018 |
Revised TRCA as on 1.7.2018 |
||
BPM with work load of 5 hours |
₹4,575-85-7,125 |
₹14,500-35,480 |
||
Sl.No |
|
|||
1 |
Assuming the basic TRCA of GDS as on 1.7.2017 |
₹4830 |
||
2 |
Annual increase of ₹85/- on 1.7.2018 |
₹4915 |
||
2 |
TRCA enhanced by fitment factor of 2.57 on ₹4915 (rounded off to the nearest rupee) |
₹12632 |
||
3 |
TRCA fixed as on 1.7.2018 (at the stage equal to the amount arrived at Sl No.3 above, if not, next stage above to the amount arrived as at Sl No.3 i.e. Stage-1 of Level-2 of TRCA Matrix) |
₹14500 |
||
4 |
TRCA on 1.7.2019 (Stage-2 of Level-2 of TRCA Matrix)* |
₹14,940 |
||
*Assuming after completion of 12 months of continuous engagement from 1.7.2018