• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
Geod.in Employees News

Geod.in

  • Home
  • PAY MATRIX
  • 7th CPC Pay
  • EXPECTED DA
  • LTC 80 Fare
  • AICPIN
  • DOPT
  • Finmin
  • Get e-mail
    • About Us

Always Popular

7th CPC Pay Matrix7th CPC Pay Calculator
8th CPC NewsTNEB Code List
6th CPC Fitment TableCGHS Rate list 2024
Expected DA July 2024AFD CSD Online Portal
AICPIN October 2024 New7th CPC CEA Form New
KV Fees 2023House Rent Form

Instructions of Fixation of TRCA in new TRCA Matrix and Payment of Arrears

Admin June 26, 2018

Instructions of Fixation of TRCA in new TRCA Matrix and Payment of Arrears

The responsibility of fixation of TRCA in the new TRCA matrix with effect from 1.7.2018 rests with the Divisional Superintendent of Post offices /RMs units for all GDS working under their jurisdiction. In respect of GDSs working in independent units like Gazetted HOs in charge of Senior Postmaster/Chief Postmaster, the fixation will be done by the Senior/Chief PM.

2. The respective authorities shall fix the TRCa of all the GDSs under their jurisdiction with reference to their existing work load, Basic TRCA drawn as on 1.7.2018 and send the names of GDSs with a statement of fixation of TRCA in the new TRCA matrix as on 1.7.2018 as per the given instructions. Obtaining undertaking from the GDS as per proforma in Annuexure IV is pre requisite for payment of arrears. The undertaking obtained from the GDSs should be kept in a separate guard file in the Divisional office which should be preserved permanently.

3. Any excess payment made on account of arrears or wrong fixation of TRCA in the new TRCA matrix will be the responsibility of the Drawing Disbursing officer. The Officials at fault shall be made accountable, in case of any court cases on over payment of arrears/wrong fixation of TRCA.

4. The work relating to merging of different TRCA slabs with work load less than 4 hours, and those having workload of 4 1/2 hours should be completed and establishment orders to the effect should be issued before 30 June 2018.The revised TRCA slabs as per Table 1 of this OM shall take effect from 1.7.2018. In case of more than on ABPM is working in a Branch Office/Dak Sevaks in departmental office, those ABPMs/ Dak Sevaks should be assigned designation as ABPM I/ABPM II/ABPM III/Dak Sevak I/Dak Sevak II etc.

5. The Divisional Superintendent shall constitute a special cell, if required, for the purpose. Similarly, the DDOs shall draw the payment form 1.1.2016 to 30.06.2018 by preparing due drawn statement and after adjusting the TRCA including DA already paid, and arrange payment. The calculation of arrears according to instructions at Para-6 may be initiated immediately so as to ensure payment latest by 15th July, 2018. Likewise, the process of fixation of TRCA in the new TRCa matrix as at para 2.2 may be completed before 25th July 2018. with regard to the payment of arrears, an undertaking in the prescribed format (Annexure-IV) should be obtained from each Gramin Dak Sevak and kept on record before disbursement of the arrears.

6. The Divisional Superintendent will arrange to communicate the names of Branch postmasters and Assistant Branch Postmasters who attend to the combined duty as per the revised rates in Annexure I, which is reproduced below:

BPM for delivery OR Mail conveyance work – ₹45/- per day subject to maximum of ₹1170/- per month

BPM for delivery PLUS mail conveyance – ₹90/- per day subject to maximum of ₹2340/- per month

ABPM for BPM work – ₹75/- per day subject to a maximum of ₹1950/- per month.

ABPM/Dak Sevak for additional work of another ABPM/Dak Sevak – ₹45/- per day subject to a maximum of ₹1170/-

The above rates will be for conbination of duties of two or more posts borne on the establishment of the concerned post office.

7. The Regional Director of postal Services/postmaster General shall carry out verification of 10% fixation of TRCA cases while inspecting the Divisional Office.

8. The Circle Postal Accounts Office shall carry out cent percent verification of fixation of TRCA, consequent on revision, by 31.12.2018. Discrepancies, if any, be got settled on the spot. Excess arrears due to wrong fixation shall be listed and reported to Regional Director of Postal Services/Postmaster General/Chief Postmaster General Concerned.

Filed Under: GDS Employees

Enter your email address:

Delivered by FeedBurner

Recent Comments

  • GTA SA MOD on Pay Matrix Chhattisgarh
  • Shankar on 7th Pay Commission Pay Matrix Table
  • Mp3 Juice on Pay Matrix Gujarat

Primary Sidebar

Search Box

Quick Links

7th CPC Pay Calculator

AFD CSD Price 2023

NPS Withdrawal Form

CGHS Rate 2023

CGHS Claim Form

CGHS Card Form

KV Fees 2023-2024

KV Uniforms 2023-24

KV Result – Search Box

KV School List

7th CPC Salary Calculator

Pay Calculator Karnataka

Pay Matrix Tables

4th,5th,6th & 7th Pay Scale

6th CPC Fitment Table

Civilian Employees

Teachers & Professor

Defence Force

Military MNS

GDS Pay Matrix

Assam

Bihar

Chhattisgarh

Gujarat

Haryana

Jammu & Kashmir

Jharkhand

Karnataka

Madhya Pradesh

Maharashtra

Manipur

Meghalaya

Mizoram

Nagaland

Odisha

Rajasthan

Sikkim

Tamil Nadu

Tripura

Uttar Pradesh

Uttarakhand

West Bengal

Other Topics

TNEB Distribution Code

Holidays 2023 

Sports Calendar 2022-2023

Copyright © 2025 · Central Government Employees & Pensioners News - Geod.in - Log in