Details Required in Connection with Cadre Restructuring of Group ‘C’ Categories
GOVERNMENT OF INDIA भारत सरकार
MINISTRY OF RAILWAYS रेल मंत्रालय
RAILWAY BOARD रेलवे बोर्ड
No. PCIII/CRC/2023
New Delhi, dated: 14.09.2022
The General Managers/Director Generals,
All Indian Railways/Production Units, RDSO
(Kind attention: PCPOs)
Sub: Details required in connection with Cadre Restructuring of Group ‘C’ categories.
Cadre Restructuring of Group ‘C’ Railway employees in the Zonal Railways/Production Units is due in the year 2023 and in connection with the same, the information as desired in the Google Spreadsheet (link given below) may please be filled up expeditiously.
Safety categories have been mentioned below the Categories wherever available. However, if any other category has been brought under the Safety category, the same may also please be included. The data sought is based upon the consolidated restructuring carried out in the year 2013 and beyond, for some Categories in isolation.
For any categories requiring restructuring, including those isolated categories that are not figuring in the Google Sheet, the functional and administrative requirement may be kept in mind and the same may be spelt out specifically.
The link to the Google Spreadsheet is as under:
https://docs.google.com/ spreadsheets/d/ 1gPK9jdFTiThHFVaNax-o9a4 NW_XbIgLXGZExZZsR0L8 /edit#gid=O
The desired information may please also be mailed at jdpcrb[at] rb.railnet.gov.in; utpal.majumdar[at] gov.in; anjana.kumari87 [at]gov.in before 03.10.2022,
This is issued with the approval of the Competent Authority.
DA: As above
(Priya Gopalakrishnan)
Joint Director/Pay Commission,
Railway Board
e-mail id: jdpcrb [at]rb.ralinet.gov.in
4th Floor, Room No. 10
Signed copy download PDF