• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
Geod.in Employees News

Geod.in

  • Home
  • PAY MATRIX
  • 7th CPC Pay
  • EXPECTED DA
  • LTC 80 Fare
  • AICPIN
  • DOPT
  • Finmin
  • Get e-mail
    • About Us

Always Popular

7th CPC Pay Matrix7th CPC Pay Calculator
8th CPC NewsTNEB Code List
6th CPC Fitment TableCGHS Rate list 2024
Expected DA July 2024AFD CSD Online Portal
AICPIN October 2024 New7th CPC CEA Form New
KV Fees 2023House Rent Form

Guidelines for Conduct of Examination for the Post of APP (Level-6) to PP (Level-7)

Harish Priyan October 7, 2022

Guidelines for Conducting the Selection for the Post of APP (Level-6) to PP (Level-7) in Prosecution Cadre

You can download Guidelines for Conduct of Examination for the post of APP (Level-6) to PP (Level-7). PDF by following the direct download link end of this article

RBE No..144/2022

भारत सरकार/GOVERNMENT OF INDIA
रेल मंत्रालय/MINISTRY OF RAILWAYS
(रेलवे बोर्ड/RAILWAY BOARD)

No. E(NG)I-2021/PM20/1 Misc.

New Delhi, dated 13.09.2022

The General Manager (P)
All Zonal Railways and PUs etc
(As per standard list) :

Sub: Guidelines for conducting the selection for the post of APP (Level-6) to PP (Level-7) in Prosecution Cadre.

As the Railway administrations are aware, RBE No. 60/2021 inter-alia provides that all officers holding the erstwhile posts of Sub Inspector (Prosecution) in Level 6 on regular basis, not meeting the eligibility criteria for promotion to the next higher grade of Public Prosecutor in Level 7, which is 5 years regular service in Level 6 in the post of Sub Inspector (Prosecution), may be allowed to continue in their present grade till the time the criteria is met.

2. As no specific guidelines exist regarding mode of upgradation from Level 6 to Level 7 in Prosecution Cadre, it has been decided that till all the existing incumbents in L-6 are exhausted, the upgradation from L-6 to L-7 may be done on the basis of seniority cum suitability, on completion of residency period of 5 years in L-6 on regular basis. The existing reservation policy should also be kept in mind.

3. As regards seniority lists, attention is drawn to instructions contained in Board’s letter No. RB/Prosecution Cell/Cdr/0i dated 10.03.2020.

4. This also disposes of CPO(Adm)/ eCoR’s D.O. No.ECoR/Pers/01/Estt. Public Prosecutor/ ECoRly/339 dated 23.11.2020.

(Sanjay Kumar)
Deputy Director Estt.(N)
Railway Board
Tele No. 23303658

Guidelines for Conduct of Examination for the Post of APP (Level-6) to PP (Level-7) – Download PDF

Click here to download PDF

Filed Under: Railway Board

Enter your email address:

Delivered by FeedBurner

Recent Comments

  • big mumbai login on Pay Matrix Gujarat
  • Pineloom on 7th Pay Commission Pay Matrix Odisha
  • Anonymous on 7th Pay Commission Pay Matrix Odisha

Primary Sidebar

Search Box

Quick Links

7th CPC Pay Calculator

AFD CSD Price 2023

NPS Withdrawal Form

CGHS Rate 2023

CGHS Claim Form

CGHS Card Form

KV Fees 2023-2024

KV Uniforms 2023-24

KV Result – Search Box

KV School List

7th CPC Salary Calculator

Pay Calculator Karnataka

Pay Matrix Tables

4th,5th,6th & 7th Pay Scale

6th CPC Fitment Table

Civilian Employees

Teachers & Professor

Defence Force

Military MNS

GDS Pay Matrix

Assam

Bihar

Chhattisgarh

Gujarat

Haryana

Jammu & Kashmir

Jharkhand

Karnataka

Madhya Pradesh

Maharashtra

Manipur

Meghalaya

Mizoram

Nagaland

Odisha

Rajasthan

Sikkim

Tamil Nadu

Tripura

Uttar Pradesh

Uttarakhand

West Bengal

Other Topics

TNEB Distribution Code

Holidays 2023 

Sports Calendar 2022-2023

Copyright © 2025 · Central Government Employees & Pensioners News - Geod.in - Log in